What it checks
Build the vertical framing stack from neutral to pole tip and determine the required pole height or the neutral height provided by a selected pole.
Engineering Zone
Estimate required utility pole height from neutral height, primary framing, phase spacing, and underbuild arrangement.
Build the vertical framing stack from neutral to pole tip and determine the required pole height or the neutral height provided by a selected pole.
Define the top framing, phase spacing, optional underbuild, and neutral relationship. The calculator totals the entered dimensions and compares them with available pole lengths.
Verify every framing dimension, attachment arrangement, pole strength, equipment allowance, and project clearance before issuing a design.
Engineering aid only. Verify the inputs, assumptions, results, and applicable project requirements before use in a final design.